Voxel Energy recently launched!

Launch YC: Voxel Energy - Rapidly deployed data centers. Power included

"The best grid connection is no grid connection."
TLDR; Voxel is building data centers and power together, speeding new builds from years to months.

Ask; If you or someone you know has GPUs and is stuck waiting for power, they would love to hear from you!

Their Launch Video: https://youtu.be/ONSk5D4-evQ

Founded by Casey Spencer, Max Pfeiffer & Evan Schmidt

Voxel was founded by ex-Tesla serial entrepreneurs and builders, who have spent the last decade defining the future of American energy consumption.

  • Casey Spencer, CEO, was Project Manager for Tesla Autopilot, and has since founded three hardware companies.
  • Max Pfeiffer, CTO, ex-Tesla, and listed on Forbes 30 Under 30 for founding the EV manufacturer Maxwell Vehicles.
  • Evan Schmidt, COO, years of experience managing millions of dollars of commercial, HVAC, and data center projects.

Problem

AI has maxed out the electrical grid. Average data center time to power is five years and growing. $3 Trillion in data center projects are slated for construction by 2030, yet half may never be built due to power constraints. Energy prices for everyone, everywhere, are creeping up. The AI bottleneck isn’t chips - it’s power.

Solution

Voxel Energy is building data centers with on-site solar energy generation, distribution, and storage for 24/7 power in months, not years.

  • No Grid Connection Wait because Voxel doesn’t need agreements with utilities.
  • Solar at Scale - they are deploying hundreds of megawatts to power GPUs.
  • 24/7 Battery Storage powers compute when the sun is down.
  • Backup Generation ensures redundant operation 365 days a year.
  • Stable Power with the rapid-response needed to handle dynamic training loads.
  • Inherent Redundancy from Voxel’s proprietary DC power distribution system.

They Have Already Started

Their systems prototype is live, operational, and already running off-grid compute. Hundreds of acres are already under contract.  And they are already amassing batteries.

Now Accepting Reservations

Voxel is taking reservations for their existing sites. Capacity is limited. Contact them if you’re tired of waiting to power your compute.

Image Credits: Voxel Energy

Learn More

🌐 Visit www.voxelenergy.com to learn more.
💥 Voxel is taking reservations for their existing sites. Capacity is limited. Contact them if you’re tired of waiting to power your compute.
🤝 If you or someone you know has GPUs and is stuck waiting for power, they would love to hear from you!
👣 Follow Voxel Energy on LinkedIn.

Posted 
January 29, 2026
 in 
Launch
 category
← Back to all posts  

Join Our Newsletter and Get the Latest
Posts to Your Inbox

No spam ever. Read our Privacy Policy
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.